TBT WTO Indonesia
Home
Regulation
Notification
FAQ
Forum
Contact Us
Login
Logout Confirmation
Apakah anda yakin
Notification Detail :: G/TBT/Notif.99/595
Main Data
Notification No.
Notification Type
Notifying Member
Date of Notification
Final Date for Comments
Days to Final Date
Title
Objective
Product Covered
The scope of the provisions is the performance of an entire measuring system when in use, not the particular sub-assembly that together with other sub-assemblies makes up a measuring system. Measuring systems consists of meters, power-lines and in some cases transformers. In Chapter 2, section 3 (a) proposed requirements for time switches are being notified. This particular provision concerns a sub-assembly.
Document Notification
Link to ePing
HSCODE
ICSCODE
29.240 - Power transmission and distribution networks
Keywords
Metrology
Specific Regions
Additional Data
Description
Notified Document
Link to Notification
EN:
File here
FR:
File here
ES:
File here
Status Active
Active
Inactive
Comment
No
#
Comment By
Title
Comment Date
File
Back
Link to ePing
App Settings
Dark Mode
NEW
Adjust the appearance to reduce glare and give your eyes a break.
Header Inverse
Sidebar Fixed
Sidebar Grid