TBT WTO Indonesia
Home
Regulation
Notification
FAQ
Forum
Contact Us
Login
Logout Confirmation
Apakah anda yakin
Notification Detail :: G/TBT/N/UKR/264
Main Data
Notification No.
Notification Type
Notifying Member
Date of Notification
Final Date for Comments
Days to Final Date
Title
Draft Resolution of the Cabinet of Ministers of Ukraine "Some issues of application of the Technical Regulation on Ecodesign Requirements for Small, Medium and Large Power Transformers during the martial law in Ukraine"
Objective
National security requirements (TBT)
Product Covered
Small, medium and large power transformers
Document Notification
Link to ePing
HSCODE
ICSCODE
29.180 - Transformers. Reactors
Keywords
Specific Regions
Additional Data
Description
The draft Resolution provides that for the period of martial law in Ukraine and one year from the date of its termination or cancellation, but in any case not longer than until 1 January 2025, Level 2 of ecodesign requirements for transformers set out in Annex 1 to the Technical Regulation on ecodesign requirements for small, medium and large power transformers, approved by Resolution of the Cabinet of Ministers of Ukraine No. 152 of 27 February 2019 (which had to come into force on 13 September 2023), will not apply to power transformers with a rated capacity of not more than 125 MVA as well as to power transformers in respect of which agreements (contracts) for the production and/or supply were concluded before 13 September 2019, if the terms of such agreements determine the number of power transformers to be produced and/or supplied.
Notified Document
1:
File here
2:
File here
3:
File here
Link to Notification
EN:
File here
FR:
File here
ES:
File here
Status Active
Active
Inactive
Comment
No
#
Comment By
Title
Comment Date
File
Back
Link to ePing
App Settings
Dark Mode
NEW
Adjust the appearance to reduce glare and give your eyes a break.
Header Inverse
Sidebar Fixed
Sidebar Grid