TBT WTO Indonesia
Home
Regulation
Notification
FAQ
Forum
Contact Us
Login
Logout Confirmation
Apakah anda yakin
Notification Detail :: G/TBT/N/SWE/154
Main Data
Notification No.
Notification Type
Notifying Member
Date of Notification
Final Date for Comments
Days to Final Date
Title
Proposed regulatory change of the Swedish Energy Agency’s secondary legislation and general advice (STEMFS 2011:4) of electricity certificates(Föreskrifter om ändring i Statens energimyndighets föreskrifter och allmänna råd (STEMFS 2011:4) om elcertifikat)
Objective
Harmonization (TBT)
Product Covered
Electricity meters
Document Notification
Link to ePing
HSCODE
ICSCODE
17.220.20 - Measurement of electrical and magnetic quantities
Keywords
Specific Regions
Additional Data
Description
The main change in the proposed regulation compared to the previous wording regards chapter 3 paragraph 3 which regulates how electricity produced in power plants connected to a non-concessional grid should be measured. The change implies that electricity sent out on the grid should be measured on a 15-minute basis instead of hourly basis. Equivalent regulation already exists for power plants connected to a concessional grid. The regulatory changes imply a harmonization of rules for the producers no matter the grid connection (non- concessional or concessional).Measuring electricity on a 15-minute basis is already enforced in Commission Regulation (EU) 2017/2195 which establishing a guideline on electricity balancing. This is already implemented in national legislation through the electricity act(1997:857), government ordinance (1999:716) and secondary legislation (2023:1). Measuring electricity on a 15-minute basis in concessional grid for issuing of electricity certificates is already implemented. However, there is yet no regulation regarding measuring on a 15- minute basis in non-concessional grid. The Swedish government have already made changes in government ordinance that regulates the use of 15-minutes measuring for issuing electricity certificates in non-concessional grid. Therefore The Swedish Energy Agency now propose to adjust the secondary legislation according to the government ordinance. The proposed changes to the secondary legislation will also equalize the rules for power plants connected to a concessional grid and those connected to a non-concessional grid.Unofficial translations will be available via the TRIS database, see link: Detalj anmälan | TRIS - European Commission (europa.eu)
Notified Document
1:
File here
2:
File here
Link to Notification
EN:
File here
FR:
File here
ES:
File here
Status Active
Active
Inactive
Comment
No
#
Comment By
Title
Comment Date
File
Back
Link to ePing
App Settings
Dark Mode
NEW
Adjust the appearance to reduce glare and give your eyes a break.
Header Inverse
Sidebar Fixed
Sidebar Grid